cupula

KUITO CHURCH

Location: Kuito, Angola
Year: 2013
Description: Rehabilitation and strengthening of existing structure. Assembly of a tubular dome structure, with a diameter of 8m and an height of 6m, with the application of a zinc cladding.
Weight: 10.0 tons
Construction area: 490 m2

back