PIPE-RACK’S LUXEMBOURG – concluded

The project consisted of the production and pre-assembly of 16 rack’s to support piping and industrial wiring.
Its implementation was subdivided into three distinct phases:
• Adequacy of the existing project to the surface treatment by galvanizing
• Dimensioning of screw connections between the various elements
• Detail, production and pre-assembly of the structure.