WASTE GAS RECUPERATION

Location: Belgium
Date: October 2020
Description: VESAM carried out the design and manufacture of the expansion of the production unit in Gent – Belgium.
In the scope of the manufacture of the new intake duct, VESAM was responsible for the design, execution and compatibility of all support structures and respective exterior and interior accesses, in an intervention area greater than 5000 m2.

back